Transparency and project status

What is confirmed, what the project owner reports, and what nobody has verified yet.

On this page

    Where the project stands

    • The project design is complete: charter, budget framework, procurement protocol, evidence register and this website are written, reviewed and locked as the reference version.
    • The next step is the appointment of a donor or implementing entity, which authorises the pilot.
    • Selection, procurement and delivery are carried out by that partner under its own rules, once it is in place.
    • This website is the project's public information channel and the entry point for a first conversation.
    • Every statement carries a label, so a reader can see what is documented and what is still being established.

    How claims are labelled

    Every factual statement about the machine, the market or the project belongs to one of these categories:

    • Verified — checked against a document or measurement by a named reviewer.
    • Owner-reported — stated by the project owner; supporting records are said to exist and have not yet been reviewed here.
    • Proposed — a design intention, not an activity that has happened.
    • Pending external confirmation — a donor, authority, supplier or institution must decide.

    If a claim on this site is not labelled, treat it as information from the project description rather than as verified fact.

    What the owner has reported

    • The machine's dough-processing capacity of 10 kg per hour.
    • The 24-month warranty.
    • The machine-only planning price of ETB 69,000 as a current figure.

    These are neither dismissed nor presented as verified. They are subjects of evidence review.

    The project owner confirmed these figures in writing on 21 November 2026. An owner's confirmation is not independent verification, and the supporting documents have not yet been reviewed.

    What has been verified here

    • The documentation baseline exists, is consistent in its core figures, and its internal links resolve.
    • The project model — facilitator only, no fund handling, no mandatory contribution, no loan — is stated consistently across the governing documents.

    Documents and corrections

    Requests for specific documents can be made through contact. If you find an error on this site, tell us; corrections are recorded rather than silently applied.

    Why this page is short

    A transparency page that lists achievements the project cannot yet evidence would be worse than no page at all. This one lists the absence of those achievements as plainly as the presence of the design.

    Published documents

    Only approved public versions appear here. Internal or confidential documents are never published.

    Partnership

    Partner with BEHAQ

    BEHAQ is at the partnership stage: the model and the documentation are ready, and the first pilot needs a donor or implementing entity to run it.

    Contact the project

    Conversations are open.