# Independent Machine-Test Protocol — ZAG DABO KOLO

**Status:** Blank protocol. Completion does not become evidence until an independent witness signs the record. The owner-reported claim to test is **10 kg of dough processed per hour**; this is not a finished-product output claim.

## 1. Test authority and independence

- Appointing donor / implementing entity: [name]
- Independent witness: [name, organisation, role]
- Supplier representative: [name]
- Test date and location: [date, site]
- Machine model and serial number: [model, serial]
- Power / manual configuration: [configuration]
- Witness conflict-of-interest declaration: [signed statement]

The witness must not be employed by the supplier and must not have a financial interest in the result. If independence cannot be established, record the test as supplier-observed only.

## 2. Pre-test checks

- Record the exact machine configuration and accessories.
- Inspect guards, electrical safety, food-contact surfaces and condition.
- Confirm the machine is clean and suitable for food-contact use.
- Record flour, water and other input specifications.
- Record ambient conditions, operator and recipe.
- Photograph the machine, serial plate and test setup with permission.
- Confirm scales and timing device are suitable and checked.

## 3. Test method

1. Weigh all dough input before processing.
2. Start timing when the first dough enters the machine.
3. Stop timing when the final dough leaves the machine.
4. Record stoppages, adjustments, jams and restarts separately.
5. Weigh processed dough output and recoverable waste.
6. Repeat for at least three runs or the number required by the appointing entity.
7. Do not discard failed or incomplete runs; record them and explain.

## 4. Run record

| Run | Dough input kg | Start | Stop | Stoppage minutes | Processed output kg | Waste kg | Observations |
| --- | --- | --- | --- | --- | --- | --- | --- |
| 1 |  |  |  |  |  |  |  |
| 2 |  |  |  |  |  |  |  |
| 3 |  |  |  |  |  |  |  |

## 5. Calculation

For each run:

- Net processing minutes = elapsed minutes − stoppage minutes.
- Dough throughput kg/hour = dough input kg ÷ (net processing minutes ÷ 60).
- Record whether the input or output basis is used and why.
- Report every run; do not report only the best run.
- Finished-product yield must be measured separately if required.

## 6. Result statement

- Claim tested: [wording]
- Runs completed: [number]
- Range of measured throughput: [range] kg/hour
- Conditions and limitations: [details]
- Claim supported / not supported / inconclusive: [select one]
- Reason: [evidence-based explanation]

## 7. Sign-off

Supplier representative: __________________ Date: __________

Independent witness: ______________________ Date: __________

Appointing entity reviewer: ________________ Date: __________

Attach raw records, photographs, calibration notes and any incident record. Store the signed record in the project evidence register under the appropriate evidence code.